Arcticnor was engaged by Carbon Circle AS to design a waste-to-energy plant in Birmingham, UK.
Carbon capture and district heating are the primary objectives for the waste-to-energy plant. Autodesk Plant 3D was used to perform the FEED-study and layout of building, structure, piping, and equipment. Our deliveries in the project were a 3D model, PFDs and intelligent P&IDs. As well as GA drawings, structural design basis, pipe stress philosophy, line list, CAD procedure and MTOs for pricing.