Arcticnor have delivered the HVAC and cooling system for the new power supply provided by ABB to Boliden, Odda. The delivery includes engineering, construction, installation, and mechanical completion of transformer-, rectifier- and room-cooling, including flow metering and control systems.
Boliden Odda AS, a zinc production plant located in Odda, Norway, is currently undertaking an expansion project known as Green Zinc Odda 4.0 (GZO). The plant, when finalized, will be the most advanced and environmentally friendly zinc producer in the world.